Diary details for November 2000 |
||
Date |
Item |
Time |
4/11/00 |
Completed rear wiring loom. Completed installing front brake pipes. |
3:00 |
5/11/00 |
Attaching engine and gearbox |
3:00 |
7/11/00 |
Engine and gearbox mated |
0:30 |
11/11/00 |
Engine installed |
4:00 |
12/11/00 |
Checking engine installation |
0:30 |
13/11/00 |
Fuel pipe rerouting |
1:00 |
15/11/00 |
Modifying stands |
1:00 |
17/11/00 |
Putting car back on stands; back to the fuel line. |
2:00 |
18/11/00 |
Footwell panels, starter motor. |
5:00 |
19/11/00 |
Front wiring loom |
5:00 |
24/11/00 |
Front wiring loom |
3:00 |
25/11/00 |
Front wiring. Washer bottle. Started steering rack and column. |
4:00 |
26/11/00 |
Steering column |
1:00 |
29/11/00 |
Steering column |
1:00 |
30/11/00 |
Yet more steering column |
1:00 |
|
November 2000 total: |
35:00 |